Inside the new Ranko lure factory

Die casting, hand assembly, painting and plating now run in one building — so your order moves in a straight line instead of between workshops.

WHERE

Gaozhou, Guangdong — China

UNDER ONE ROOF

Casting · Painting · Assembly

NEW PLANT

Molds, casting and finishing in the same building

WHY WE MOVED

One roof, one standard

For years our soft lures and hard baits were built across several workshops. Every move between them added handling, waiting and a fresh chance for a batch to drift off spec.

The new Gaozhou plant puts the whole sequence in a single flow: raw zinc and lead arrive at one end, finished lures leave sealed at the other. That means shorter lead times, fewer damaged parts in transit, and one quality standard applied from the first casting to the last carton.

AT A GLANCE

Plant  
New factory in Gaozhou, Guangdong

Flow  
Six production stages under one roof

Products  
Soft lures and hard baits

Service  
OEM & ODM, private label

01

Die casting in-house

Our own presses and molds, so a design change does not wait on a supplier.

02

Hand assembly

Hooks, split rings and blades rigged and bonded by trained assemblers.

03

Painting & coating

Spray booths and rack drying on the same floor as assembly.

04

Plating & finishing

Metal components finished and inspected before they reach a bench.

SIX STEPS, ONE BUILDING

Quality-assured standard processes

Walk the same route a lure takes. Each step has its own station, its own check, and a short walk to the next one.

CASTING CELL · BUILDING 12

01

Die casting & mold making

Lure bodies and hardware start as molten zinc and lead poured into molds cut in our own tool room. Every cavity is checked against the master before a run begins.

02

Trimming & polishing

Flash and parting lines are ground away under extraction hoods, then surfaces are polished until the body is smooth enough to take paint evenly.

FINISHING BOOTH · DUST EXTRACTION

SPRAY BOOTH · OVERHEAD EXTRACTION

03

Painting & coating

Bodies are sprayed in ventilated booths, layer by layer, to hit the pattern on the approved sample. Airflow is pulled through ducting above the booth so overspray never settles on a wet part.

04

Curing & rack drying

Freshly painted and plated parts go onto steel racks and move down a dedicated aisle to cure. Racks are labelled by order so a batch is never mixed with another.

DRYING AISLE · RACK BY ORDER

ASSEMBLY BENCH · COMPONENT TRAYS

05

Assembly & bonding

Hooks, split rings, blades and skirts are rigged by hand at long benches, with components sorted into trays beside each station so nothing is picked from the wrong bin.

06

Sorting & packing

Finished lures are sorted by colour and size, counted into trays, and packed to the carton spec agreed for your order. The last person to touch the product is checking it.

SORTING TABLE · PACK-OUT STATION

THE BUILDING

Room to grow into

The hall was laid out with empty bays on purpose: as order volume climbs we add benches and presses into space that is already wired, lit and ventilated.

Machine-made where a machine holds the tolerance better, hand-built where a lure needs eyes and fingers. Both sit on the same floor, so a batch never waits in a queue between buildings.

VISIT US

See the line before you place the order

Samples tell you what a lure looks like. A walk through the plant tells you whether the same lure will look like that in the tenth thousand. We are happy to open the floor to customers and auditors.